Site Prep for In-Stock Ready to Deliver Sheds
SITE PREPARATION RECOMMENDATIONS
♦Buildings with Pressure Treated Runners and Wood Floors:
4 to 6 inches of road base gravel
The pad needs to be 1 foot larger than building on each side and front and back.
Needs to be completely level
♦Floorless Buildings with Concrete Foundations:
Monolithic slab 18 inches deep by 8 inches wide with 4 inches of concrete in the middle
Needs to be completely level.
The concrete pad needs to be 0” less on the length and 4” less on the width.
(Check with your local building dept. to make sure this is to code)
♦Floorless Buildings with NO Foundation:
Make sure ground/dirt/gravel is level.
If you are choosing a gravel pad, make sure the pad is 1 foot larger than the building on each side and front and back.
SHEDorize and Amishland LLC is NOT responsible for any and all site preparation (gravel, concrete, dirt, etc.) and assumes no liability for it. If the pad is out of level and the Customer wants the Building to be level, additional charges will incur.
