4 SHEDorize Anchors with Ties
4 SHEDorize Anchors with Ties
Free Shipping!
Couldn't load pickup availability
The SHEDorize 4 Anchors keep your Outdoor Structure safely secured to the ground. Easy to install, heavy duty, load tested Penetrator screw type anchors.
· FULLY ASSEMBLED: These anchors come with penetrators and cables. Only tool needed is an impact wrench with 1” socket.
· LOCAL CRAFTSMAN: Designed in the USA.
· LARGE CAPACITY: The 26” penetrator anchors are made to secure an Outdoor Structure up to 16’ long.
· HEAVY DUTY: Our 26” penetrator anchors are made with quality cast aluminum 356 alloy. Tie off cables are included to attach to the outdoor structure.
· SIZE AND ACCESSORIES: Four - 26” penetrator anchors, Four PE-TC Tie Off Cables. For buildings up to 16’ Long.


Sold and Distributed in the USA
The 4 SHEDorize Anchors with Ties is designed in the USA. You can rest assured the products you buy from us will look great and last long, very long!
These anchors are made of aircraft-quality cast aluminum 356 alloy. They are heat treated to T6 specifications. So you know it will last without rusting or rotting. It measures 26” long.
Designed in the USA. We want to make organization easy for you, so that it’s one less thing you have to think about. Our goal is to take care of the organization, so you can spend your time and energy doing what you do best, whatever that may be!
Dimensions: 26” Penetrator Anchors, 24” Tie Off Cables
Designed in the USA.
Site Prep Instructions
Site Prep Instructions for In-Stock Ready to Deliver Sheds
SITE PREPARATION RECOMMENDATIONS
♦Buildings with Pressure Treated Runners and Wood Floors:
4 to 6 inches of road base gravel
The pad needs to be 1 foot larger than building on each side and front and back.
Needs to be completely level
♦Floorless Buildings with Concrete Foundations:
Monolithic slab 18 inches deep by 8 inches wide with 4 inches of concrete in the middle
Needs to be completely level.
The concrete pad needs to be 0” less on the length and 4” less on the width.
(Check with your local building dept. to make sure this is to code)
♦Floorless Buildings with NO Foundation:
Make sure ground/dirt/gravel is level.
If you are choosing a gravel pad, make sure the pad is 1 foot larger than the building on each side and front and back.
SHEDorize and Amishland LLC is NOT responsible for any and all site preparation (gravel, concrete, dirt, etc.) and assumes no liability for it. If the pad is out of level and the Customer wants the Building to be level, additional charges will incur.
