SHEDorize Motion Sensor Light
SHEDorize Motion Sensor Light
Free Shipping!
Couldn't load pickup availability
The SHEDorize Motion Sensor Light is an excellent tool to help you see inside your outdoor structure.
· FULLY ASSEMBLED: This light comes fully assembled with mounting screws, no wires or electrician needed.
· BATTERY OPERATED: This light is fully battery operated. Size D Batteries required (not included). Batteries usually last up to one year.
· AUTOMATIC SENSOR: The automatic motion sensor provides 300 lumens of bright light for dark areas in your outdoor structure without the need for a light switch. The sensors pick up motion from 18 feet away. Shuts off in 20 seconds if no further motion is detected.
· SIZE AND ACCESSORIES: 2.56 x 7.48 x 7.48 inches. Mounts durability anywhere with screws. LED provides 300 lumens of bright neutral light. 300 square foot of light coverage.


Sold and Distributed in the USA
The SHEDorize Motion Sensor Light is designed in the USA. You can rest assured the products you buy from us will look great and last long, very long!
The automatic sensor provides 300 lumens of bright light for dark areas in your outdoor structure. The unique diffuser on the face of the light spreads the light for a wider coverage area. It also features a shut off and a light sensor to help prolong battery life. Expect about one year of light on each set of batteries with the average use of 8-10 activations per day.
Installation takes less than 5 minutes – no wires or electrician needed!
Operating conditions are 0 to 131 degrees Fahrenheit.
Site Prep Instructions
Site Prep Instructions for In-Stock Ready to Deliver Sheds
SITE PREPARATION RECOMMENDATIONS
♦Buildings with Pressure Treated Runners and Wood Floors:
4 to 6 inches of road base gravel
The pad needs to be 1 foot larger than building on each side and front and back.
Needs to be completely level
♦Floorless Buildings with Concrete Foundations:
Monolithic slab 18 inches deep by 8 inches wide with 4 inches of concrete in the middle
Needs to be completely level.
The concrete pad needs to be 0” less on the length and 4” less on the width.
(Check with your local building dept. to make sure this is to code)
♦Floorless Buildings with NO Foundation:
Make sure ground/dirt/gravel is level.
If you are choosing a gravel pad, make sure the pad is 1 foot larger than the building on each side and front and back.
SHEDorize and Amishland LLC is NOT responsible for any and all site preparation (gravel, concrete, dirt, etc.) and assumes no liability for it. If the pad is out of level and the Customer wants the Building to be level, additional charges will incur.
