6 SHEDorize Totes (Does not include the rack)
6 SHEDorize Totes (Does not include the rack)
Free Shipping!
Couldn't load pickup availability
The SHEDorize Totes are a great way to keep your items organized in your Outdoor Structure. (Does not include the rack)
· YOUR STORAGE SOLUTION: This set of totes is the perfect way to add extra organization to your garage or shed. They are made to pair with the SHEDorize 6- 27 gallon tote rack to maximize your space.
· MULTI-UNITS: Install more than one unit next to each other and maximize your storage potential!
· CAPACITY: These totes can store lots of stuff , so you can store everything you need to, while also having it close by and easily accessible. You can adjust the spacing to anything you want.
· MATERIALS: Made from durable plastic, these totes are strong enough to hold 75 pounds per tote. They also include snappable lids to make them extra secure.
· SIZE: 16.4" H x 22" W x 38.2" D. Stackable.
·


Sold and Distributed in the USA
The 6 SHEDorize Totes (Does not include the rack) is designed in the USA. You can rest assured the products you buy from us will look great and last long, very long!
Made of solid, durable plastic, each tote can hold up 75 pounds. That’s a lot of stuff you can keep organized!
Dimensions: 16.4" H x 22" W x 38.2" D.
Site Prep Instructions
Site Prep Instructions for In-Stock Ready to Deliver Sheds
SITE PREPARATION RECOMMENDATIONS
♦Buildings with Pressure Treated Runners and Wood Floors:
4 to 6 inches of road base gravel
The pad needs to be 1 foot larger than building on each side and front and back.
Needs to be completely level
♦Floorless Buildings with Concrete Foundations:
Monolithic slab 18 inches deep by 8 inches wide with 4 inches of concrete in the middle
Needs to be completely level.
The concrete pad needs to be 0” less on the length and 4” less on the width.
(Check with your local building dept. to make sure this is to code)
♦Floorless Buildings with NO Foundation:
Make sure ground/dirt/gravel is level.
If you are choosing a gravel pad, make sure the pad is 1 foot larger than the building on each side and front and back.
SHEDorize and Amishland LLC is NOT responsible for any and all site preparation (gravel, concrete, dirt, etc.) and assumes no liability for it. If the pad is out of level and the Customer wants the Building to be level, additional charges will incur.
